Baywalk Talisay Phase 3 - GALLERY
Features in every Phase
- Perimeter Security Fence
- * Separate Entrance
- * Jeepney Stop with Waiting Shed
- * Centralized Water System w/ OH Tank
- * Ample Area for Community Facilities & Open Space
Structure - Pre-Cast Concrete
- Wall Interior - Unpainted, Smooth Cement Finish
- Wall Exterior - Painted Smooth Cement Finish
- Floor - Plain Cement Finish
- T&B Floors - With Tiles
- Wall - Plastered with 0.60m H Tiles
- Toilet - Flush Type
- Lavatory - White
- Kitchen Counter - With Tiles
- Kitchen Sink - Pre-Fab Concrete Sink
- Stairs - Concrete
- Water Lines - UPVC Pipes and Fittings
- Water Connection- Separates Charge
- Electrical Lines - Complete
- Electrical Connection- VECO, Separate Charge
- Roof Framing Steel Purlins
- Roofing Colored Sheet, Gauge 28
- Gutter
- Ceiling
- Provision for 2 room
- Ceiling on 2nd floor
- 1 C.R. Tiled